How Long Does It Take to Replace Your Roof?

How long does it take to replace your roof?

Replacing your roof is no small project. A considerable amount of time is invested in choosing your contractor, deciding on materials such as a shingle or metal roof, and selecting your warranty tier. 

Which then begs the question: after all that effort, how much will your roofing project disrupt your homelife? Will you be left with noise on your roof and building supplies in your yard for days, weeks, months? 

On average, it takes 1-2 days to complete a shingle roof replacement project, assuming no factors hinder the crew's progress. Factors such as material, weather, and roof size can increase the timeline of your roof project. 

In this article, you’ll review realistic timelines of a roof replacement based on these factors, common delays to be prepared for, and how to plan for your roofing contractor. 

We’ll cover: 

Think of this article as your chance to sit down and ask an experienced contractor about roof replacement expectations—because that’s precisely what it is! 

We’re Equity Roofing, an Owens Corning Platinum Preferred Contractor with a 5-star rating on Google. We’ve addressed concerns for hundreds of homeowners across our locations in Central Pennsylvania, Northern Indiana, and Southern Michigan. No matter where you are in your home project, we’re here to help you move forward with confidence. 

How long until a roof replacement is done

How Many Days Until a Roof Replacement is Finished?

The amount of time it takes for a complete roof replacement depends on the size and complexity of your home. The roof material you choose can also influence the duration of your project. 

Base Timeline With Simple Roof & Single-layer Tear-off

Roof Size Shingle Roof Metal Roof
Small (2,000–2,900 sq ft) 1 day 1 day 
Medium (3,000–4,000 sq ft) 1 day (with multiple crews)  2 days 
Large (4,500–5,500+ sq ft) 1-2 days 3+ days

Additional Time Add-Ons 

Project Factor Time Added
Double-layer Tear-off +1 to 2 extra days 
Decking Replacement +1 to 2 extra days 
High-Complexity Roof (Shingles) +0.5 to 1 extra day
High-Complexity Roof (Metal) +1 to 2 extra days

What Factors Impact Replacing Your Roof?

Replacing a roof involves a combination of planning, materials, and structural factors that can significantly affect timelines and cost. Here's a breakdown of the most important variables that can impact your roof replacement project:

Material Type & Roof Size

Shingle roofs are generally faster to install. A simple 2,200–2,900 sq ft shingle roof may take a single day, but larger or more intricate roofs increase the workload. 

In contrast, metal roofing installation is a more progressive process. Installers must work in a linear fashion (e.g., left to right), and fewer people can work on the roof simultaneously. 

Home Age & Decking Condition

Older homes can present hidden challenges. For instance, homes built before the 1980s may have plank decking instead of modern plywood sheathing. These planks often shrink over time, creating gaps that no longer meet installation code. This may require crews to resheet the entire roof, adding time and cost. 

Homes that have undergone multiple roof replacements may also have patchy or mismatched decking, which can complicate the installation process.

Roof Complexity

The more nooks and crannies your roof has, such as dormers, skylights, chimneys, valleys, and multi-level sections, the longer a roof replacement will take. These features demand extra time for careful flashing and sealing. 

While these factors impact both shingle and metal roofs, they especially slow metal roofing due to the need for precise panel cuts and flashing installation.

Attic Access

Having accessible attic space allows contractors to inspect the underside of your roof deck before tear-off. Attic inspections can reveal issues like sagging, rot, or leaks ahead of time, helping avoid unexpected delays once work begins. 

Number of Existing Roof Layers

If your roof has more than one layer of shingles, expect extra tear-off time and increased dumpster and disposal needs. Multiple layers can also hide damage or trap moisture, meaning crews often discover additional issues only after removal. This not only slows the timeline but can increase costs if decking repair is needed.

HOA or Local Regulations

Homeowner associations (HOAs) and local ordinances can significantly affect scheduling. For instance, HOA noise restrictions may mean crews can’t start before 8 AM and must wrap up by 6 PM. In rare cases, work may only be allowed between 9 AM and 5 PM, which can extend the timeline.

Common Delays for a Roofing Project

Understanding potential delays can help homeowners better prepare for their roofing project and set realistic expectations. We’ve listed the most common factors that can push back your roof replacement timeline. 

what happens if it rains during my roof replacement

Local weather is by far the most significant cause of roofing delays. Roofing contractors cannot safely remove existing roofing materials if there's any risk of rain damaging the exposed interior of your home. In the event of rain during your roof replacement, your roof should be immediately covered with a tarp for protection and only removed once the weather has cleared.

Equity Roofing has experienced this firsthand. Our crew once lost 11-12 working days in May due to rain. It took a lot of rescheduling and hard work to make up for this lost time, but in the end, it’s always better to deliver a safe and quality product. 

Additional delays include:

  • Materials

    Uncommon colors for shingles, such as red, green, and blue, may take longer to deliver from distributors. Rush orders or last-minute color changes can cause delays in your project.
  • Crew availability

    When one job runs longer than expected due to weather or supply issues, it creates a ripple effect through the entire schedule. Reputable contractors should offer flexibility for rescheduling in the event of delays.  
  • Hidden Issues

    Decking or rot issues are often undetectable during initial inspections and can add a day or more to your project. 

5 Things You Can Do to Prevent Roof Project Delays

While some delays are beyond anyone's control, homeowners can take steps to minimize the risk of project delays. Being proactive can help your roofing contractor deliver the smoothest possible experience.

  1. Provide attic access before the job. This allows roofing crews to inspect conditions before the project begins.
  2. Share any past roofing records or information, such as the number of shingle layers on your roof. 
  3. Avoid last-minute changes to shingle color or opt for commonly available gray, brown, and black options. 
  4. Prepare the space by clearing driveways and yards, and discuss parking for your roofers. Move any items of concern to a safe location, such as decorations or grills. 
  5. Understand seasonal lead times and plan ahead. Summer is considered the peak season for roofing projects and is often booked out 6-8 weeks in advance. 

can I stay in my house during a roof replacement

FAQs About Roof Replacement Timelines

How far in advance is a roofing job scheduled?

  • Peak Season (spring-fall): 2–6 weeks out
  • Off-season (late fall-winter): 1–3 weeks out

Can I stay in my house during a roof replacement?

Absolutely. The work is loud but safe. If you have sensitive pets or infants, you may want to consider staying elsewhere for the day. Please note that yard activities will be unavailable while your roofing crew is working. 

What happens if it starts raining during my roof replacement?

Your roofing crew will tarp any exposed decking for protection and pause work. Depending on how long the rain is expected to last, they may remain on site to wait out the rain. Otherwise, they will return when conditions allow. The tarp should remain on your roof until work can be continued. 

During the work, will my roof deck be exposed?

Yes, though not for long. Once the old shingles or metal are removed, underlayment can be applied quickly to protect your home.


how to plan my roof replacement

Planning Your Roof Replacement

You now have a realistic idea of how long your roof replacement should take and what could delay the completion of your new roof. While this is one of the most significant home projects you’ll undertake, you’re prepared to handle hiccups caused by severe weather, scheduling issues, or unforeseen decking repairs.

When you're ready to move forward, choose a contractor who delivers on their promises. Start with our list of top-tier contractors for Central PA, Northern Indiana, and Southern Michigan, all ranked by our Five Golden Standards.

Equity Roofing combines transparent planning with expert execution, ensuring your roof replacement stays on schedule and within budget. Our experienced team will walk you through every step, from initial assessment to final cleanup, so you know exactly what to expect.

Don't leave your home's protection to chance. Contact us today for a free consultation and discover why homeowners trust Equity Roofing for their most important investment.